Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

Product Details
Customization: Available
After-sales Service: Video Technical Support/Online Support
Warranty: 1year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (23)
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
  • Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Weight (Kg)
8000
Unique Selling Pointcontinuous Productio
Continuous Production
Advantage
Labor Saving
Melting Type
Continuous
Productivity
10-15t/H
Transport Package
40FT Container
Specification
11500*2300*2400
Trademark
LIJIU
Origin
China
HS Code
8474390000
Production Capacity
50units/Year

Product Description

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational CostsEnergy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
Product Description

This product is used for the rapid melting of massive and bagged asphalt. It can solve the problems of uneven heating aging, slow melting rate and wasted energy consumption of the existing process oil tank.
Core four systems of this product:

  1.  Rapid heating up system
The system can provide 900,000 calories per hour heat, heat conversion is more than 90%, the system is divided into two main parts. The main system is a rapid heating system, which provides 60 calories of heat per hour. The heating of asphalt mainly depends on the main system (note: the main system adopts direct heat heating, without thermal conduction medium, and should be immersed in the asphalt liquid level below 5 cm. It is recommended to maintain the liquid level for long-term use). The secondary system is the heat conduction medium, providing 300,000 kcal heat per hour. The main function is auxiliary heating. The auxiliary system is not restricted by the asphalt level. When the liquid level is lower than the main system, the secondary system can be used for asphalt heating and tank cleaning as usual.
  1.  Solid asphalt constant temperature thermal cutting system

Solid asphalt constant temperature thermal cutting system is an adjustable thermostatic heat carrier circulation system to continuously and quickly divides large volume of solid asphalt into small pieces of asphalt with width of 5-10 cm. This system is the core system of solid asphalt melting of the equipment: 1. Increase the heating area of solid asphalt.2. The block asphalt is initially preheating and melted to the flow shape.
3. Horizontal mixing system
The system adopts the horizontal whole body mixing with the tank body, using 11 kw frequency conversion control power. When the asphalt temperature is low and the viscosity is large, and the solid asphalt is not completely melted, low speed mixing, the peristalsis movement of materials in the equipment to avoid the full integration of local high temperature and high and low temperature asphalt. When the asphalt is completely melted, high speed mixing can be carried out.
4. Hydraulic flap feeding system
Using the feeding mode of the heating plate, the feeding board has a heating device, working at 120ºC, can make the ton bag of asphalt smoothly into the equipment solid asphalt constant temperature thermal cutting system. Solid asphalt enters in the back section of the equipment, and the front section of hot asphalt is pumped out, which can form continuous feeding. After the feeding, the turning plate is closed to forming a confined space, reducing the heat loss and improving the melting speed.
Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs
 
Product Parameters
 
            
Number Name quantity Company parameter remarks
One Asphalt system
1 Asphalt conveying pump 1 platform 3QGB45-2-40 4KW, insulation jacket pump, flow rate: 6 cubic meters, pressure: 0.6MPa, (variable frequency speed regulation)
2 Asphalt flowmeter 1 platform Lc-utne40.2 DN40
3 Pneumatic valve 1 platform DN50  
4 filter 1 set    
Two Soap system
1 Hot water heating box 1 platform 1.5m3 Equipped with 51 thermal oil heating coils and 50mm rock wool insulation wrapped in stainless steel plate.
2 Soap can 2 platform 1.5m3 1.5KW, made of 304 stainless steel material, stainless steel double slurry mixer with liquid level display.
3 Additive addition tank 1 platform 0.15m3 304 stainless steel material, stainless steel double straight slurry mixer.
4 Additive addition pump 1 platform 3m3 1.5KW, gear pump
5 Soap liquid stainless steel multi-stage pump 1 platform DFL-50-32-160D Motor power 2.2KW, flow rate: 10 cubic meters, equipped with stainless steel check valve (special anti-corrosion, alkali resistant, acid resistant. permanently leak free)
6 Pneumatic valve 4 platform Q641F-16P  
7 Flowmeter 1 platform Ldjb-040sm2 DN40
8 weighing system 3 set   Weighing and measuring
Three Finished product system  
1 Cooling heat exchanger 1 platform KS016-5-304-N 20square meter heat exchange area
2 Finished product box 1 platform 3 tons carbon steel
3 Finished pump 1 platform 2.2kw 1.5KW, submersible finished product pump output
4 stir 1 platform 1.5kw Worm gear double straight slurry mixer
Four Host control and accessories
1 Emulsifying mill 1 platform LJ-13 Motor power 37KW, speed: 2950min
2 Control 1 set Composite components PLC automatic proportioning system
3 Weighing auxiliary display 1 platform   Color screen display
4 Air compressor 1 platform 3KW  
Five frame
1 frame 1   7700*2300*2500 Frame 100 * 100 square tube base 120 * 120 square tube
2 colour       ash
 
                        
                        
                        
                        
                                       
 

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational CostsEnergy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

Packaging & Shipping

Energy-Saving Emulsified Asphalt Equipment, Reducing Operational CostsEnergy-Saving Emulsified Asphalt Equipment, Reducing Operational Costs

FAQ

 

 
Q: How's about the payment terms?
A: We usually accept T/T, LC. T/T: 30% in advance as down payment, the balance before delivery.
 
Q: How's about the trade terms?
A: EXW, FOB, CFR and CIF are acceptable.
 
Q: How about the delivery time?
A: Usually we need about 20 days production time after down pay.
 
Q: How about after-sale service?
A: Our products' quality warranty is one year after delivery, we can provide online support, also can send out our engineers to your place if you want.
 
Q: What should I do for the quality problems?
A: If you meet quality problems please send to me the products photo first ,our after service department will deal with for you.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier